My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.7. SR 03-21-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
03-21-2011
>
3.7. SR 03-21-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2011 10:30:38 AM
Creation date
3/18/2011 10:30:38 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />TO ITEM NUMBER <br />Ci Council 3.7. <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Consent March 21, 2011 ustin Femrite, P.E. <br />ITEM DESCRIPTION REVIEWED By <br />Lift Station Control Panel Replacement <br /> REVIEWED BY <br />ACTION REQUESTED <br />Authorization to accept the low quote received from Quality Flow Systems, Inc., to complete the <br />replacement of the control panels at the Highway 10 and Simonet lift stations. <br />BACKGROUND/DISCUSSION <br />The control panel and associated components at both the Highway 10 and Simonet Drive lift stations <br />have been scheduled for replacement in 2011 as budgeted and detailed in the Capital Improvements Plan. <br />We have developed a scope of work associated with the replacement during the summer of 2011. <br />Chief Operator Gary Leirmoe solicited quotes from 5 companies to complete the work. Two of those <br />companies never returned a call and a third decided at the last minute to not submit a quote for the work. <br />FINANCIAL IMPACT <br />The two quotations received for the work are summarized as follows: <br />Electric Pump $52,050 (+ Tax) <br />Quality Flow Systems, Inc. $46,450 (+ Tax) <br />The quotes identified include the full price to complete both lift station control panels. We recommend <br />approval of the low quote submitted by Quality Flow Systems, Inc. Funding for the project will come <br />from the Sanitary Sewer fund. The quotes are well below the estimated project cost of $79,000 that was <br />included in the Capital Improvements Plan. <br />ATTACHMENTS <br />2 Quotations <br />Action Motion by Second by Vote <br />Follow Up <br />N:\Public Bodies\Ciry Council\Council RCA\Agenda Packet\03-21-2011\3-21-11 Lift Station RFA.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.