Laserfiche WebLink
REQUEST FOR ACTION <br />TO ITEM NUMBER <br />Ma or and Ci Council 4.1. <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Worksession Februa 14, 2011 Rich Czech, Arena Mana r <br />ITEM DESCRIPTION REVIEWED By <br />Ice Arena Addition /Renovation Lori ohnson, Ci Administrator <br /> REVIEWED BY <br />ACTION REQUESTED <br />Consider xecommendarion from Ice Arena Commission fox approval to move foxwazd with conceptual <br />drawings for the Arena Renovation. <br />BACKGROUND/DISCUSSION <br />Since 2005 there has been discussion about remodeling the front area of the Arena. In 2007 conceptual <br />drawings were drafted and there was discussion at City Council level about the project. However, due to <br />the need of a maintenance facility fox the Streets and Parks Departments, the project was put on hold. <br />The project at that time included the lobby, new locker rooms for the Bam, varsity locker rooms, and a <br />meeting room. Since then the scope of the project has changed due to the number of Capital <br />Improvement Plan (CIP) items and the age of the Barn. <br />The old side of the Arena (the Bazn) was built in 1971, which puts it at 40 yeazs old (ten years beyond its <br />life expectancy). There are items in the Barn over the next few years that will need to be updated; some <br />of them will go undone due to space restrictions. An example of one of these items is a wheelchair <br />viewing area. <br />Besides needing several pieces of equipment to maintain the Bam (see attached CIP) over the next five <br />yeazs, the Bam is structurally outdated and needs some major renovation to bring it up to today's <br />standards. Below are a few of these projects that could be addressed if a renovation of the Bam would <br />take place. <br />As the Council is aware, in 2008 the roof over the Barn was scheduled to be replaced. However, due to <br />the possibility that there may be an expansion in the near future, the roof was patched and the project <br />was postponed. Since then we have started to notice that it is once again leaking and will need to be <br />repaired fox a second time. I don't believe any of us want the roof repair to end up like the floor <br />replacement did for the Bam a few years back. For several years the replacement of the floor in the Bazn <br />was delayed to the point where it became a major issue. During this time Arena staff made the necessary <br />repairs to the in-floor tubing in time for the beginning of each season. Finally, in the fall of 2003, the <br />floor imploded and we almost didn't have ice in the Bam that yeaz. The Arena lost $37,282 in revenues <br />due to the fact that there wasn't ice until December and it had $27,162 in added expenditures before the <br />floor was in operational condition. <br />N:\PubGc Bodies\City Council\Cound RCA\Agenda Packet\02-142011\Arena Renovation.docx <br />