Laserfiche WebLink
ELK RIVER LIBRARY BOARD AGENDA <br />NOVEMBER 21, 1995 <br />6:30 <br />Call To Order <br />Determine Quorum <br />Visitors <br />Adopt Agenda <br />Secretary's Report <br />Minutes <br />Correspondence <br />Suggestion Box <br />Treasurer's Report <br />Librarian's Report <br />Old Business <br />The bill from Weatherly Electric that was questioned, included the cover that was <br />installed over the switch on the library sign outside the building. <br />I am still waiting to hear from the following people regarding corrections that need to <br />be made: <br />The carpet installers -steaming the carpet to reactivate the glue <br />Pneumatic controls Company -correct the temperature problems <br />in the small conference rooms <br />Kue Contractors -repair buckled sheet rock in the children's area, <br />nail pops, counter top at front desk, restain beams where water <br />leakage, plug in covers that are breaking off, replace pipe in the <br />furnace room <br />New Business <br />Marsha O'Brien will not be reapplying for her position on the library board when <br />it expires on December 31, 1995. We thank Marsha for her contribution to the <br />board during the past six years. <br />Other Matters <br />Adjourn <br />IF YOU ARE UNABLE TO ATTEND THE MEETING BE SURE TO CALL THE LIBRARY. <br />441-1641 <br />