My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-19-1996 LIB MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Library
>
Library Minutes
>
1990-1999
>
1996
>
03-19-1996 LIB MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2010 9:25:58 AM
Creation date
11/30/2010 9:25:58 AM
Metadata
Fields
Template:
City Government
type
LIBMIN
date
3/19/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER LIBRARY BOARD MINUTES <br />MARCH 19, 1996 <br />Board Members: <br />Murray McNair present <br />Linda Ritchie present <br />Elly Kretsch present <br />Mary Keifenheim present <br />Eleanor Holm present <br />Also Present: Mick Stoffers, Librarian <br />Meeting was called to order at 6:30 pm by Chair Murray McNair. <br />Minutes of the February 20, 1996 meeting were approved as <br />presented. There was no correspondence. <br />Bills were approved for the month of February. <br />Librarian's Report: <br />Mick presented the annual report to the City Council on Monday, <br />March 18, 1996. Board members in attendance were Murray, <br />Eleanor, Elly and Linda. Murray was also able to inform the <br />Council about the need for a new roof on the old portion of the <br />library. <br />Mick notified Builders Sound & Security by fax and by mail that <br />the Library no longer required their service. A thirty day <br />notice to cancel was required. Their representative became <br />threatening. Mick spoke to the Elk River Utility Representative <br />and Tom Zerwas regarding claims made by the BS&S <br />representative. The Elk River Utilities rep will take pictures <br />of the system as it is and then remove BS&S equipment and have <br />it boxed and ready for the BS&S rep when he arrives. <br />Mick received another bill ($1,400) for the heating coil that <br />froze and was replaced just after the 1 year warranty expired. <br />Mick faxed the bill to Rick Wessling and there has been no <br />response. <br />Mick received a call from Pneumatic Controls regarding $275 not <br />paid. Mick said we are waiting for air conditioning season to <br />see if the motorized damper works. At that time we will send <br />the 10% we have held back. This seemed to be okay with the <br />caller. <br />Cliff Skogstad from the city is to come by and inspect the roof <br />before a request for bids is made. The roof appears to need a <br />need membrane and better support to eliminate ponding. Costs <br />will likely be $24,000-$28,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.