My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-1996 LIB MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Library
>
Library Minutes
>
1990-1999
>
1996
>
04-16-1996 LIB MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2010 9:25:23 AM
Creation date
11/30/2010 9:25:23 AM
Metadata
Fields
Template:
City Government
type
LIBMIN
date
4/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER LIBRARY BOARD MINUTES <br />APRIL 16, 1996 <br />Board Members: <br />Murray McNair present <br />Linda Ritchie present <br />Elly Kretsch present <br />Mary Keifenheim absent <br />Eleanor Holm present <br />Also present: Mick Stoffers, Librarian <br />Verne, GRRL <br />Jennifer Lindahl, Student <br />Meeting was called to order at 6:40pm by Chair Murray McNair. <br />The board welcomed Jennifer Lindahl who was in attendance to <br />observe the meeting as part of her high school government class. <br />Minutes of the March 19, 1996 meeting were approved as written. <br />There was no correspondence. Bills were approved for March. <br />Librarian's Report: <br />Per Cliff Skogstad (from the City of Elk River) Inspec, Inc. has <br />contracted with the City of Elk River to handle the process of <br />bidding for the new roof on the old part of the library. Inspec, <br />Inc. will inspect the roof, determine what needs to be done, <br />advertise and review bids for the work and propose which company <br />will do the work and test their work. The board felt the <br />proposed fees for this were a bit high. <br />The modulating hot water valve has been replaced and has been <br />okay for two weeks. <br />The new security system has been installed and is being tested. <br />It will cost more money per month ($3) than originally <br />determined as the system will require daily testing because <br />there is only one line. Still much cheaper than the other <br />system. <br />Mick distributed an updated board member list. <br />Verne reported that the new computer has been installed at <br />headquarters and is bigger and faster. <br />Meeting adjourned at 7:15. <br />Respectfully submitted, <br />Elly Kretsch <br />Secretary/Treasurer <br />Elk River Library Board <br />f,PG~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.