Laserfiche WebLink
CON~ILTINGENGINEERS <br /> <br />1326 Energy Park Drive <br /> <br />St. Paul, MN 55108 <br />612-644-4389 <br /> <br />1-800-888-2923 <br /> <br />Fax: 612-644-9446 <br /> <br />CIVIL ENGINEERING <br />ENVIRONMENTAL <br />MUNICIPAL <br />~IANNIN© <br /> <br /> ,~JD WASTE <br />STRUCTURAL <br />SURVEY!beG <br />TRAFFIC <br />TRANSPORTATION <br /> <br />ELEC[RICAL/MECHANICAL <br />ENGINEERING: <br /> <br />HVAC <br /> <br />POWER DISTRIBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTR©~_S <br /> <br />OFFICES IN: <br /> <br />~INNEAPOLIS <br /> <br />, RIOR LAKE <br /> <br />ST. PAUL <br /> <br />WASECA <br /> <br />ITEM 4.3. <br /> <br />February 26, 1997 <br />File: 230-320-30 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />ORONO LAKE 3RD ADDITION, LOWELL AVENUE, <br />JOPLIN STREET IMPROVEMENTS <br />CONSTRUCTION CONTRACT AWARD <br /> <br />Dear Council Members: <br /> <br />After the close of the assessment hearing for Orono Lake 3rd Addition and the public <br />hearing and assessment hearing for the Lowell Avenue improvements, the City Council <br />may consider the award of the construction contract for these two improvements plus the <br />Joplin Street improvement which was bid with these two projects. Bids for all three <br />improvements were opened on January 7, 1997. There were a total of 16 bidders. The <br />following list provides a tabulation of the bidders and their total bid. <br /> <br />R. L. Larson Excavating <br />S. J. Lewis Construction <br />Annandale Contracting <br />Barbarossa & Sons, Inc. <br />LaTour Construction <br />Redstone Construction <br />Richard Knutson, Inc. <br />Landwehr Construction <br />Northdale Construction <br />Arcon Construction <br />Bonine Excavating <br />S. R. Wedema, Inc. <br />Hardrives, Inc. <br />C. W. Houle, Inc. <br />Ryan Contracting <br />W. B. Miller, Inc. <br /> <br />$490,952.60 <br /> 505,568.06 <br /> 518,343.33 <br /> 534,467.20 <br /> 536,792.79 <br /> 551,072.98 <br /> 561,570.55 <br /> 561,607.65 <br /> 564,292.71 <br /> 569,189.62 <br /> 576,961.24 <br /> 598,546.45 <br /> 608,907.94 <br /> 630,514.40 <br /> 648,304.05 <br /> 653,701.90 <br /> <br />An Equal Opportunity Employer <br /> <br /> <br />