My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 08-10-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2010
>
08-10-2010
>
4.1. ERMUSR 08-10-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2010 4:32:57 PM
Creation date
8/6/2010 4:32:57 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal Utilities <br />13069 Orono Parkway • EO. Box 430 <br />Elk River, MN 55330-0430 <br />UTILITIES COMMISSION MEETING <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />TO: FROM: <br />Elk River Municipal Utilities Commission Troy Adams, P.E. -Director of Operations <br />John Dietz, Chair <br />Jerry Gumphrey, Vice Chair <br />D l Thom son, Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Au ust 10, 2010 4.1 <br />SUBJECT: <br />Power Su ly O tions /Resource Plannin Update <br />BACKGROUND: <br />In September 2008, Connexus Energy terminated the 10-year rolling "all requirements" power contract <br />with Elk River Municipal Utilities. In April 2010, the Utilities Commission authorized entering into <br />"Phase l" of a resource planning study with a coalition which includes Central Minnesota Municipal <br />Power Agency (CMMPA) as a participant. <br />CMMPA gave a presentation of sensitivity assessment and portfolio options to the coalition participants <br />on August 4~' in Elk River. This is paR of Phase 1 of the resource planning study. This presentation was <br />attended by Jerry Gumphrey -Commission Vice Chair and Troy Adams -Director of Operations. Some <br />additional sensitivity analysis will be done specific for each participant. A presentation of Phase 1 results <br />for Elk River is tentatively scheduled to be ready by the September Commission meeting. <br />A confidentiality agreement between Connexus Energy and Elk River Municipal Utilities specific to <br />power supply negotiations has been signed by ERMU. In conjunction with these power supply <br />negotiations, Connexus has invited ERMU representatives to take a tour of Great River Energy's Coal <br />Creek Station. This power plant and adjacent lignite coal mine is located in North Dakota approximately <br />50 miles north of Bismarck. This tour is scheduled for September l~`. <br />ACTION REQUESTED: <br />No action required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.