Laserfiche WebLink
^~/ <br />Elk <br />River <br />REQUEST FOR ACTION <br />To Item Number <br />Ma or and Ci Council 5.5. <br />Agenda Section Meeting Date Prepared by <br />Administration une 7, 2010 ohn Anderson P.E. <br />Item Description Reviewed by <br />Main Street Pavement Rehabilitation Project Lori ohnson, Ci Administrator <br /> Reviewed by <br />Action Requested <br />Consider adoption of the attached two resolutions ordering the assessment hearing and establishing the <br />amount to be assessed. <br />Bacl~ground/Discussion <br />The City Council authorized advertising for bids for this project on May 3, 2010. Bids were opened on <br />June 1, 2010. The low bid in the amount of $443,874.70 was submitted by Rum River Contracting. The <br />resolutions the council is asked to consider set the date of the Assessment Hearing to June 28, 2010 and <br />set the maximum amount that can be assessed to properties to be $354,212. This amount represents 70% <br />of the total cost being assessed to the properties. The assessment rate to an individual property would be <br />$4,167.20, <br />The City Council has discussed establishing a policy that discounts the assessment rate due to the fact <br />that the roadway in question handles more than local traffic. The Council may at their discretion provide <br />staff with direction as to what, if any, adjustment factor to apply to this assessment. The Feasibility Study <br />for this project included a draft policy that provides adjustments to the assessment rate to account fox <br />traffic volumes. This draft policy has been updated with the project costs as bid. The draft policy is <br />attached for the council to consider adjustments to the assessment amount. MnDOT has conducted <br />their regularly scheduled traffic counts on Main Street and the data shows the ADT to range from 4,950 <br />to 6,200 along this portion of Main Street. A reduction to 40%, of the origina170% assessed, would <br />equal an assessment rate of $1,666.88. A reduction to 25%, of the origina170% assessed, would equal an <br />assessment rate of $1,041.80. <br />Financial Impact <br />The total project cost is $506,017 which includes the construction cost of $443,875, and overhead cost of <br />$62,142. The overhead cost includes preliminary engineering of $29,000 and construction related <br />engineering of $19,000. The City has budgeted $400,000 from the street improvement fund for this <br />project and $100,000 from special assessments. <br />Attachments <br />^ Resolution Determining the Assessment Cost <br />^ Resolution Establishing the Date for the Assessment Hearing <br />^ Bid Tabulation <br />^ Draft policy on High Volume Roads (revised 6-2-10) <br />