My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 12-12-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
12-12-2011
>
6.2. SR 12-12-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2011 11:22:01 AM
Creation date
12/9/2011 11:20:21 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item # 6.2. <br />MEMORANDUM <br />.~..~. <br />Elk <br />River <br />TO: Mayor and City Council <br />FROM: Justin Femrite P.E., City Engineer <br />DATE: December 12, 201 I <br />SUBJECT: 171St Area Phase (Improvements -Preliminary Engineering <br />This memo summarizes the preliminary engineering work that has been completed for the <br />Phase 1 improvements to the 171ST Area as authorized by the City Council on Apri14, 2011. <br />The location of the city-owned 29-acre Phase 1 portion of the development is shown on <br />Figure No. 1. The memo discusses the required improvements, costs, funding sources, and <br />detailed project timeline for final completion. <br />At the work session, staff will review the developable lots, improvement layout, project costs, <br />process, and schedule for completing the improvements in Phase 1. <br />The intent of completing Phase 1 at this time is to establish an implementation pattern. It is <br />staffls experience that a tangible project is more marketable, and less risky, to potential buyers. <br />Developable Lots and Land Uses <br />The proposed alignment of Twin Lakes Road and associated connecting side streets as shown <br />in the attached figures will create three lots fox a total of 15.31 acres. The land uses for the <br />lots, as proposed in the 171St Avenue Focused Area Study, are designated as Transit Center <br />and Jobs Area. Transit Center is intended as a mixed use, predominately jobs based, but <br />allowing some housing and some retail. Jobs Area is intended as an office, manufacturing <br />area, perhaps similar to the Business Park zoning district. The two northern most lots are <br />designated for Transit Center uses and the largest lot in the southwest portion of the <br />development is designated for Jobs Area uses. <br />When reviewing how the new street alignments would dissect the property, a lot of <br />consideration was given to maximizing the amount of developable area, minimizing total <br />wetland disturbance, lot shapes, points of access, proximity of the existing gas main, and <br />overall layout of the existing topography of the land. <br />The proposed lot configuration for parcels in Phase 1 is shown on the attached Ultimate <br />Improvements figure. Twin Lakes Road is designated as a major collector roadway in the city <br />Comprehensive Transportation Plan. As such, no new direct accesses are proposed on this <br />corridor through the development. Access to the 0.86 acre lot in the northwest corner of the <br />development would be from the existing entrance located on 1715` Avenue across from <br />FO~ERER I1 <br />NA~~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.