My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-17-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
05-17-2010
>
5.4. SR 05-17-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 3:05:21 PM
Creation date
5/14/2010 2:29:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(02) Surface Water Quality. The Permittee shall have surface water qualitytests performed in <br />conjunction with sampling quarterly events when water is present. <br />(03) Off-Site Groundwater Quality The Permittee shall annually sample the individual private <br />wells identified in the Phase IV Water Quality Monitoring Work Plan required by section 4(05). All <br />private wells shall be analysed for pH, COD, ammonia, chlorides, specific conductance, and volatile <br />organic compounds (MDH method 465C and EPA method 601, 602). <br />(04) Modification. The testing programs specified in this Section 7 may be modified by City staff if <br />City staff reasonably deterniirles there exists a need for additional wells to be tested or additional <br />parameters to be analyzed, based upon water or air quality test results indicating the presence of <br />contamination. <br />8.) Hydrogeologic Investigation. The investigation of the hydrological and geophysical <br />characteristics of the site shall be continued and any other new information relating to the <br />hydrogeologic impact of the site shall be reported to the City . Hydrogeologic reports shall be <br />updated, amended, and modified as warranted by newly discovered or additional data acquired in the <br />continued hydrogeologic investigation. The Permittee shall also notify City at least two (2) days in <br />advance of any soil boring or well construction required by this Permit. The Permittee must conduct <br />additional contaminant investigation and monitoring as requested by the MPCA in the vicinity of <br />P304C, P320 and an area southeast of P314C. <br />9.) -Dust, Noise, and Odor. Fugitive dust emissions off-site shall be controlled at the Landfill site <br />as necessaryby undertaking the following:. road surfaces within the Landfill Site shall be wetted with <br />water or an appropriate chemical whenever off-site dust levels become unreasonable as deternuned by <br />the City Environmental Administrator. Dust pollutives shall be utilized to the extent necessary on <br />cover maxerial such as stockpiles to reduce wind erosion as well as on other exposed surfaces as <br />appropriate. Cover compaction and revegetation activities shall be undertaken promptly on the <br />completion of various fill areas and vegetative cover capable of quick growth shall be utilized. <br />Plantings of bushes and trees shall be installed if needed to buffer the Landfill Site and min; ;~e wind <br />erosion. <br />All equipment and vehicles utilized at the Landfill Site shall be periodically inspected and <br />maintained to m;n;m;7e noise. Vegetative bamers along the boundaries of the Landfill Site shall be <br />utilized to ,Y„n;m;~.~ off-site noise impacts. Applicable state standards for noise pollution shall not be <br />exceeded bythe Landfill operation, equipment, vehicles, or machinery. <br />The Permitee agrees that it will use best management practices to control against odors. The <br />Environmental Administrator may make recommendations regarding possible odor controls. If a <br />verified odor problem is ongoing, both parties agree to institute good faith negotiations to 1rLn;m;7e <br />the odor problem. If in the event that the City receives ten or more complaints within asix-hour <br />period relating to a single odor description and this odor complaint has been verif ied by both City and <br />Permitee and identified as coming from the Facility, the Permitee shall cease such activity(s) that are <br />the direct cause of the odor(s). Normal activity(s) shall not resume until the Permitee has, to the <br />satisfaction of the City, fullymitigated against such odor(s). <br />S:\PLANNING MAIN\Case Files\CUP\CU 10-02 ER Landfill\LANDFILL CUP 2010 2 ib 10 CC vexsion.DOC Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.