Laserfiche WebLink
protected turn lanes and a southbound acceleration lane. Staff feels that traffic associated <br />with this operation is adequately addressed. <br />5. Recommendation <br />The FIanning Commission is recommending approval of the renewal of the Elk <br />River Landfill's conditional use permit and solid waste facility license with tlxe <br />changes to these documents proposed by staff. The major changes in the conditions <br />contained in these documents include: <br />+ Bio-reactor (leachate recirculation) is approved contingent on approval by MPCA <br />and Sherburne County. If this system is not functioning properly the city has the <br />ability to stop the process and have the Landfill return to conventional waste <br />disposal and leachate treatment. <br />• Approval of cells 14 through 17 is contingent on city staff's review and approval <br />of the construction details. <br />• 3 to 1 slopes are approved contingent on approval by MPCA and Sherburne <br />County. <br />+ An end-use plan is made part of the next renewal of the city's permits for the <br />Landfill. <br />If approved with 3 to 1 slopes, the Landfill will have approximately 8,500,000 cubic <br />yards of remaining capacity, which staff estimates will last 10 to 15 years. <br />