My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-17-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
05-17-2010
>
5.4. SR 05-17-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 3:05:21 PM
Creation date
5/14/2010 2:29:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/09/2010 16:18 + BRIGGS tV10RGAN MPLS 1 PAGE 37/60 <br />wish Industrial Activaty. The ERL's existing Sformwater Pollution ka•eventiozx flan <br />(SWl'S~p) will also be updated to include the proposed expansion. The SW~i'PP will be <br />updated as necessary to comply with upcoming ~evv gtormwatox xegulatioxxs. <br />Electrical Setyice. t~dequate electA'ieal service is provided at the site .for opesatioxzs and <br />repairs. The larzdfxll generates electricity at the landl;xll gas to energy facii;ty_ <br />5. Wdll noC lltvolve uses, acifivities, pvoce~tses, materials, e~r~ipmetsP aa'ad co-tditio~as of <br />Oj7G'Ya;!1p71 ~l/p'.t 7VYII (1e (~G~'PrisneaaZrcl to any,pevsons or,~r~operty because of excessive <br />traffic, raolse, s~raoke, ftartes, glare, odors, tdrest or vi~iratiorts <br />Traffic. No add.itioz~,al lxflffic i5 expected to be generated by the proposed exparisior>< since <br />the overall operation of the proposed oxpeaasxob is not anticipated to include sigzuf caxxt <br />increases in waste flow over the current opezation, effects on traffic coxxgestion would be <br />expected to be ininim,al_ <br />oise. No additional operatipg ztoise is expected to be ,gezterated. by the proposed <br />expansion, <br />Smoke. The landfill will zaot generate axool{e. <br />Ponies. See Odor discussion iu tlae sta1:emcnts regarding CUI' finding nuzntbex 1. <br />Glare. The landfill •will not utili2e lighting that will create glare or 1igbt tzespass issues, <br />Odors, See Odor discussion in the etatenrients regarding CUP fitadiztg number 1. <br />Dust. Ilrgitive dust exx~assions ofd site will be controlled at tl~e laudTll site as necessmy <br />by undertalci~;g the following and in accordance with the facility's Fugitive Exni.ssions <br />Control Plan. <br />Irip74111406'CigAppPe~1~Q8 ~+.epo~ry• final (2~doc 3-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.