My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-17-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
05-17-2010
>
5.4. SR 05-17-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 3:05:21 PM
Creation date
5/14/2010 2:29:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/09/2010 16:18 + BRIGGS IYtORGAN W1PLS 1 PAGE 32/60 <br />_ ~''he 1/RL will continue tp perform on-site at~d off site water- quality testiuag zn the matLraex <br />required by flee MPCA pe~oit. Tlie ors-site nnonitozi~ag wolls shad sett curxeaat <br />Depaw•tment of Hoaith Well Code Star~,datds. ERL wiU aanualIy aatnpie the izrdividual <br />.pxivat~e wells identif ed in tlae Phase IV V~Iater Qualify IVTonitor;~ug Work Plan xecluired ,by <br />Section A~(OS) of tlxe approved CUP. ,A, Water Quality Report shall be submitted to the <br />City wlzezx it is subzaittcd to i;he N.IiE'C~. <br />7.. a.ie <br />~lt.L will contizzuo to eitlxex ri~aintaiz~ backup puwps ;for use in the event of putx~p failure <br />on-site, oz• L~RT, will znaa_utain provisions far resfozing teniporaxy leachate pumping within. <br />a 24-how' period aztd adhere to the current "Leachata Management Plan" as approved U3' <br />l~'C24. <br />'fhe FRT. purr~ps rho existing leachate taz~l~s on a regulru' schedule. Z,eachate will not be <br />allowed Co collect on the liner to a depth exceeding one foot due to the leachate-holding <br />tank being full. <br />The facility is approved to recirculatiozareachate. Remedies for psoblerrzs ~urasax~.$ from <br />leaelaate recirculatioza it7.clude, but aze not limited to, the aessation of leachate <br />recia'culation, and xevertix~g back to ixaditional leaaha•te treattxteaat, <br />Phase N Water (3uality ozut Tina Worlc Plcua and Hydroeeolo~c l~.~orts <br />The phase 1:V Water Quality Maiutoring Work P1w desczabes tlae san2plin$ £reyueney, <br />parameters, protocols ar~d xepoxtizig frequoi~cy £or Landfill gas, leachate, leachate <br />piezo~etezs, leachate, kyaimetvr, resideutlal wells, groundwater motti.toring wells and <br />surface water will be updated annuaaly to reflect chaaages ui the monitoxxxAg systems. <br />'1'he iz~vesti$ation of tl~e laydrologieaI and geophysical characteristics ofdie sate will be <br />coaatinued and arty other new infor~,ation zelating to the hydxogeologie impact of the site <br />will be reported to tlae City..T-lydrogeologic reports will be updated, axxreXxded, and <br />r;W792\1406\Ci0•AP-I'ebWP~ ~vaSJtnnl (1J.doe 3-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.