My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-17-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
05-17-2010
>
5.4. SR 05-17-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 3:05:21 PM
Creation date
5/14/2010 2:29:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(a) All relevant construction specifications; <br />(b) All shop drawings for prefabricated components; <br />(c) Photo documentation of all critical aspects of construction; <br />(d) Deflection testing results for leachate collection and transmission pipes; <br />(e) Narrative description of all as-built variances from the plans and/or specifications; <br />(f) As-built cross-sections of the liner sub grade; <br />(g) As-built elevations for all pipe inlets and outlets and pump-on/pump-off controls; <br />(h) Completed manufacturer warranties; <br />(i) All physical testing results for soils and other materials used for construction. <br />(10) Pe17nittee shall notify the City at least two (2) days in advance of liner barrier layer installation <br />or final cover barrier layer installation. The Permittee shall assist the City in arranging inspection of <br />the site at any reasonable time the City requests. The Permittee shall keep the City informed of <br />ongoing construction progress and shall specifically notify the City of significant changes encountered <br />in the geological, hydrological, or construction conditions. The City may reasonably requite work <br />which is covered or otherwise obscured prior to City inspection, to be re-excavated for City <br />Inspection. - <br />(11) Temporary Fencing - On-Site Litter Control. Litter control fences shall be maintained around <br />the working areas} of the Landfill to prevent die blowing of paper or other litter on or off site. The <br />Pel7nittee shall assign employees to engage in a regular and routine program to inspect the Landfill <br />Site and clean up areas where litter accumulates on dze Landfill Site. <br />(12) Permanent Fencine. The Permittee shall maintain a minimum six-foot high fence around the <br />perimeter of the site if and when necessary, based upon reasonable concerns regarding public safety or <br />trespassing or uncontrolled dumping. <br />(13) Public Information. The Permittee shall maintain a sign at the entrance to the Landfill Site <br />which describes in common terms the substances which may be disposed at the Landfill and those <br />substances which may not be accepted for disposal. <br />(14) Sanitary Facilities. Adequate sanitary facilities and shelter shall be provided for site personnel. <br />(15) Electrical Service. Adequate electrical service shall be provided at the site for operations <br />and repairs. <br />(16) Fire Fighting_ Fite fighting equipment including at least one piece of heavy equipment, fire <br />extinguishers in all machines working in the Landfill., and a water truck shall be kept available on the <br />site during the active life of the Landfill. The self-contained breathing apparatus purchased for the <br />City Fire Department shall be available at the Fire Department for use by permittee on a temporary <br />S:\PLANNING MAIN\Case Files\CUP\CiJ 10-02 J;R Landfill\LANDFILL CUP 2010 2 16 10 CC vexsion.DOC Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.