My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-17-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
05-17-2010
>
5.4. SR 05-17-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 3:05:21 PM
Creation date
5/14/2010 2:29:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall approve any Alternative Cover Material. Additional random tests maybe <br />conducted at the discretion of the City Environmental Administrator at the <br />expense of the Licensee. The City Environmental Administrator may make <br />reasonable recommendations for how placement of Alternative Cover Material is <br />to occur. Stockpiling of cover material shall not interfere with surface water <br />control measures- <br />The City Environmental Administrator may approve the use of tarps in place of <br />daih~ cover material. Approval is continent up©n adequate demonstration that <br />the use of such tarps_meets the requirements of this license agreement and MPCA <br />rules. r~a~~i~i~~ <br />(04) Gas Ver~ti:-n~Collection System. Licensee shall conduct active landfill gas <br />collection ven~i~in accordance with approved plans and shall construct <br />additional phases of the active gas control system at the time of final cover <br />construction. <br />(OS) Phase IV Water Quality Monitoring Work Plan. The Phase IV Water <br />Quality Monitoring Work Plan which describes the sampling frequency, <br />parameters, protocols and reporting frequency for landfill gas, leachate, leachate <br />piezometers, leachate lysimeters, residential wells, groundwater monitoring wells <br />and surface water shall be updated annually to reflect changes in the monitoring <br />systems. The monitoring plan shall yield adequate information for assessing the <br />effectiveness of the landfill gas control system in decreasing VOC contaminants <br />in the groundwater. <br />(06) Annual Active Landfill Gas Control System Assessment. Annually assess <br />the effectiveness of active landfill gas venting operations based on the results of <br />groundwater and landfill gas monitoring and incorporate the evaluation in the <br />MPCA Annual Report for the landfill. <br />(07) Heavy Metal Contaminant Monitoring and Assessment. Heavy metal <br />contaminants for surface water and groundwater must be addressed in addition to <br />VOC contaminants. Based on the need for additional monitoring to confirm <br />exceedances and identify trends, the Landfill shall continue monitoring and <br />prepare evaluation reports which shall be submitted with the MPCA Annual <br />Reports. <br />(08) Heavy Metal Contamination Feasibility Study. If heavy metal <br />concentrations in groundwater and surface water exceed regulatory standards, the <br />Landfill will be required to conduct a Feasibility Study and submit it to City staff <br />on a schedule determined by City staff. <br />(09) Construction Quality Assurance Reports. A Construction Quality <br />Assurance (CQA) Report shall be submitted to the City prior to the placement of <br />waste on newly constructed lined areas. A CQA report shall also be submitted for <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.