Laserfiche WebLink
(a) Monthly and Annual Waste Disposal Volume. <br />(b) Schedule of construction activities for the forthcoming year. <br />(c) Type, Quantity and Source of Material to be Disposed. <br />(d) Remaining permitted capacity <br />(e) Updated contour map which indicates the elevations of all fill areas <br />(f) Assessment of the Financial Assurances Plan. <br />(g) Evaluation of the Water Monitoring System and a proposal for <br />continued sampling and analysis. <br />(h) Detailed evaluation of all water quality results by means of tables <br />and graphs. <br />(i) A groundwater contour map based on the previous years' <br />groundwater level data. <br />k17) `Industrial Solid Waste ManagementPlan for Demolition Debris", January <br />2004~~~~~~r~1 <br />(18) Submittal for January 2000 LicenseRenewal, revised June 2001, <br />~t~•~~r6~subject to the following conditions: <br />(a) Leachate head shall not exceed a maximum of 12 inches for any <br />liner. The Landfill shall monitor Leachate head levels weekly and <br />submit results to the City quarterly. <br />(b) The sampling and contingency action protocols for liner leaks shall <br />be as outlined in the Phase IV Water Quality Monitoring Work <br />Plan, revision #3 dated February 2003. <br />(c) The Construction Quality Assurance Program shall be amended to <br />document compliance with MNDOT 3877.2B standards for <br />sampling and testing of topsoil. <br />(d) Operation of the Active Gas Venting System shall be managed to <br />mitigate landfill gas migration and ongoing ground water <br />contamination from the unlined portion of the Landfill. <br />Any changes made to the above described plans, reports, MPCA Solid Waste <br />Permit No. 74 and the County License shall also be reviewed and approved, <br />4 <br />