My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 05-03-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
05-03-2010 JOINT
>
5.3. SR 05-03-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2010 10:38:32 AM
Creation date
4/30/2010 10:38:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/3/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name of project: Target North Campus and Target Tech Center <br />Description: <br />These two sites are situated on large blocks of ground (80 acres and 40 acres <br />respectively) where Target chose to significantly limit the amounts of conventional <br />mowed turf. The Target North Campus holds approximately 3,000 employees and <br />includes a trail that circles through a large tract of the prairie. The Target Tech site has <br />only 10-20 employees and does not include a trail. Both sites are low maintenance and <br />are not irrigated.. <br />These plantings are highly successful. Target is contracting with Prairie Restorations, <br />Inc. (PRI) to maintain and manage these sites. At the North Campus site, which is older, <br />they are continuing to remove areas of conventional landscape and are planting those <br />areas with native plants. PRI is contracted to do this work as well. <br />Name of client: ':`,~~r~~et ~:orporation <br />Location: Brooklyn P~7f'.., MN <br />Contact: Greg Ault, H~ Buildings Operations Manager <br />Phone #:.763-44;~-3016 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.