My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.4. SR 10-02-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
10-02-1995
>
9.4. SR 10-02-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2010 9:57:48 AM
Creation date
4/30/2010 8:53:59 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/2/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 <br />. e. A water appropriation permit from the Department of <br />Natural Resources must be obtained. <br />f. The wells located at the Julius Nemeth residence, the <br />scale house and the wash operation, shall be monitored <br />once a year for diesel range organic's (DRO). If mining is <br />to occur below the water table, the above wells must be <br />monitored for DRO prior to excavation activities <br />commencing and after their cessation. Further, in the <br />event of a spill, appropriate water tests will be taken <br />until the spill is deemed clean. <br />g. Groundwater levels shall be monitored in the wells <br />located at the Julius Nemeth residence, the scale house, <br />and the wash operation, prior to the start of wash <br />operations and an additional 3 times during the first <br />week of said operation to predict the long term effects of <br />the pump operation. Thereafter, the aforementioned <br />wells shall be tested a minimum of twice per month, said <br />frequency to be increased during dry periods. This routine <br />testing shall also be done for the water recycling pond. <br />• h. Water usage by mining activity shall not adversely affect <br />adjacent residential wells. Mitigative measures may <br />include, but are not limited to, curtailing of pumping <br />activities until water levels return. <br />i. The appropriate storm water permit shall be obtained by <br />the operator from MPCA. <br />(19) Signage for the gravel and ready mix operations be allowed as <br />per the I-2 zone. Further, no bill boards are allowed on the subject <br />property. <br />(20) The entrance and loop road around the ready mix plant shall be <br />hardsurfaced as approved by staff. <br />4.) General Provisions- <br />(01) Permits- Operator agrees to comply with all of the provisions <br />hereof and agrees to save and hold the City harmless from any and all <br />claims or actions arising from the operations of the Operator on the <br />Property. <br />• <br />cupSHIEI,/bz/sr <br />
The URL can be used to link to this page
Your browser does not support the video tag.