Laserfiche WebLink
AUG 0 8 1906 <br />Hoisington Koegler Group Inc. <br />~~ <br />August 7, 1995 <br />To: Mr. Steve Ach <br />City Planner, City of Elk River <br />13065 Orono Parkway <br />EIk River, MN 55330 <br />Froru: Paul Paige, RLA <br />Re: Proposal of Design Services for the Hwy. 10 corridor adjacent to downtown Elk River. <br />Dear Steve, <br />Hoisington Koegler Group Inc. (HKGi) proposes design services for the Hwy. 10 corridor as <br />follows: <br />Task <br />1). Preparing and compiling base map information (does not include potential time regeeired <br />by MSA to organize%ompile previous survey work from the corridor). <br />2). On site analysis and exploration. <br />3). Development of a Concept level plan for xhe Hwy. 10 corridor between Babcock Park <br />and the Feed Mill. <br />4). Coordination with and presentation to City staff. <br />HKGi proposes to complete the above mentioned tasks for an amount not to exceed $2,550.00. <br />HKGi proposes to bill the above described work on an hourly basis, not to exceed the amount <br />indicated above without prior City approval. Additional expenses such as plotting, repro., and <br />mileage would be billed at actual cost. <br />Please call if you wish to discuss the details of this proposal further. _ <br />Sincerely, <br />Paul Paige <br />Hoisington Koegler Group inc. <br />Land use r Environmental ~ Planning 'Design <br />'300 Metro Boule~:ard Suite ~'~ ~finneacolis. Minnesota ;;.~;9 ~ (6 i 2) 83~-9960 Fax: (612) 8~)-~ ~ 60 <br />