Laserfiche WebLink
-~~r ~~ <br />{ <br />( <br />ity of ~~ MEMORANDUM <br />lk ~ TO: Mayor & City Council <br />River <br />FROM: Phil Hals, Street/Park Supt. <br />DATE: October 2, 1995 <br />ITEM 5.7. <br />SUBJECT: Concrete Curbing on Parking Lot at <br />Woodland Trails Park <br />On September 13, 1995, the Park and Recreation Commission voted 7-0 to <br />request that the City Council reconsider installing concrete curbing around <br />the parking lot in Woodland Trails Park. The cost estimate for the entrance <br />road and the parking lot curbing is $16,000. The cost for the parking lot <br />alone is $6,000. <br />I spoke with a curbing company and was assured that the curbing can be <br />installed after the asphalt parking lot is paved. <br />The out of pocket costs so far include: <br />• <br />Archaeolo Stud <br />gY Y $ 2 000 <br />Equipment Rental 3,000 <br />Class 5 base 12,500 <br />Culverts 3,350 <br />Lighting 10,500 <br />Asphalt Paving 60,000 <br /> $91,350 <br />Less grant amount <br />Total City Expenses $41,350 <br />(not including concrete curbing) <br />• <br />WDLNDCRB.DOC <br />13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 <br />