Laserfiche WebLink
Page 5 <br />(11) .Dust Control <br />• a. A ermit from MPCA re ardin air emissio s <br />p g g n shall be <br />obtained when required .and particulate emission <br />standards shall be met by the operation. <br />b. All equipment shall be located as to reduce dust to <br />adjacent properties. <br />c. Watex, but no chemical agents, shall be used to control <br />dust as necessary. <br />d. The City reserves the right to require additional <br />measures to be taken, if warranted by dust problems, <br />including but not limited to reducing stock pile heights. <br />(12) Hours of Operation <br />All mineral excavation, processing, and sales activities shall be <br />conducted between the normal hours of 7:00 a.m. and 7:00 p.m., <br />Monday through Saturday. Upon approval of the Building and <br />Zoning Administrator, or his/her designee, sales (hauling <br />• product off-site) may occur outside of the normal hours (on a <br />temporary basis not to exceed 7 days) to address a unique <br />situation. <br />(13) Noise <br />a The noise from screening and crushing associated with <br />this operation. shall be controlled by equipment location <br />on site, the placement of stock piles, and the type of <br />equipment used. <br />b. Noise levels associated with this operation, shall at no <br />time exceed State standards. <br />c. The City reserves the right to require additional <br />measures be taken, if warranted by noise. <br />(14) Sh°p <br />a. No unscreened outside storage shall be allowed. <br />• <br />cup SHIEL/bz/sr <br />