Laserfiche WebLink
Proposed Temporary Classrooms Narrative <br /> <br />The Objectives of our temporary classrooms are to: 1. Improve student classrooms. <br /> 2. Reorganize classroom use of main building to allow for permanent youth <br /> center for church youth within the building. <br /> 3. Improve quality of academic conditions for elementary classrooms that would <br /> be specifically designed for classrooms meeting. Academic standards of the <br /> day school rather than spiritual standards for Sunday Schools. <br /> <br /> The Classrooms would be set parallel with current buildings' east setback of <br />55.43 ft. It would be set back from the south property line by 142.44 ft. and from the <br />west property line by 282.57 ft. <br /> <br /> The Emergency access to current building would be unchanged and the temporary <br />classrooms are accessed according to code from either end of center hallways. All alarm <br />systems would be joined with current system. <br /> <br /> Access to classrooms would make use of ramps meeting incline code <br />specifications. <br /> <br /> The proposed classrooms lack of plumbing facilities would be easily met by <br />location of bathrooms in main building which would be within 70'. The temporary <br />classroom would be equipped with water coolers for student convenience. <br /> <br /> The proposed classrooms would absorb 16 current parking spots. This would not <br />create any inconvenience as on any given day our school has over 40 extra parking spots <br />for additional use. <br /> <br /> The intent of these classrooms is not expansion but rather reorganization of <br />facility use until purchase and construction of new school facilities can be completed. <br /> <br /> To meet future needs we are pursuing purchasing adjoining property for school <br />expansion. With the school moved to a new building continued church growth would also <br />be afforded. <br /> <br /> The classrooms are one year old and have been most recently used by the <br />Waconia Public Schools. These classrooms meet all Minnesota building code <br />requirements. <br /> <br /> We are requesting a permit for these classrooms for 5 years. Our actual use <br />of these classrooms will probably not exceed 3 years. We are setting up the lease <br />With the William Scotsman Company for 3 years. <br /> <br /> <br />