My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 08-13-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
08/13/2001
>
6.1. SR 08-13-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:36 AM
Creation date
5/14/2003 2:47:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R, Green Company <br />August 7, 2001 <br />File: 811180J-0240 <br /> <br />Ms. Michele McPherson <br />Director of Planning <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, Minnesota 55330-0490 <br /> <br />RE: KLIEVER LAKE FIELDS FINAL PLAT <br /> <br />Dear Ms. McPherson: <br /> <br />As requested, we have reviewed the final plat of the first phase of Kliever Lake Fields Addition. <br />The plat consists of 59 single-family lots located in the northwesterly portion of the total plat <br />area. Based on our review, we would offer the following comments: <br /> <br />The preliminary drainage and utility plans submitted with the preliminary plat indicate a <br />number of areas where additional easements need to be placed for overland drainage, <br />ponding, or utility pipes. Until we review a final set of construction documents, it is <br />difficult to determine exactly where all of these easements need to be placed. <br />Therefore, recording of the final plat should be held until final construction plans can be <br />reviewed and approved and the plat made to be consistent with the final construction <br />documents. This includes drainage and utility easements in Outlots A and B of the final <br />plat for conveyance of drainage and construction of detention ponds. <br />The dedication portion of the final plat states in two locations "Planning Commission of <br />the County of Sherbume" and "Board of Commissioners of the County of Sherbume." <br />This should be changed to "Planning Commission of the City of Elk River" and "City <br />Council of the City of Elk River." <br />The final plat needs to contain the official street names. The Building Department <br />should provide these names. <br />Street E should be extended slightly farther south so as to line up with the south line of <br />Lot 5. <br />The final plat should show limited access along CSAH 12 from the intersection of Street <br />E to the northwest corner of the plat. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />TJM:mw <br /> <br />O:~ROJ~81118OJ\0240~Ltr-080701-McPherson.doc <br /> 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.