Laserfiche WebLink
-'-i <br />~;; <br />;_ <br />~__~ ~- <br />The conditions and requirements were explained to Mr. Rich Czech. The corrections must be completed <br />by 1/10/2010 or an extension requested from the jurisdiction. <br />Jurisdiction Number: MN000042039 Type: Freon Tank Location: CR 1, Dump 2 <br />Jurisdiction Number: MN000042042 Type: Freon Tank Location: CR 1, Dump 1 <br />Condition(s): The safety valve (SV) set pressure is above the maximum allowable working pressure of <br />the tank. <br />Requirement(s): Replace the SV with an ASME/NB valve set no higher than 250 psi vv'ith a mini,~~um <br />capacity of 799 scfm. <br />The conditions and requirements were explained to Mr. Rich Czech. The corrections must be completed <br />by 1/10/2010 or an extension requested from the jurisdiction. <br />Please advise via a-mail when the corrective action has been completed so that we can schedule <br />a follow-up inspection or arrange to issue the certificate of inspection. <br />Should you have any questions, please contact me at the email address below. <br />Thank you for your concern and cooperation in this matter. <br />Yours truly, <br />John Cady <br />Jurisdictional Inspector <br />St. Louis Operations <br />john.cady@fmglobal.com <br />JC/cs <br />cc: Fran DiNardo <br />decision onpwhethe Band how to address any hazardlor conditions Thle aati lity of Factory Mutual Insurance Companyr s I mited to that onta nedtin tse the <br />insurance policies. No liability or policy coverage is created by reason of this correspondence or the inspection on which it is based. <br />