Laserfiche WebLink
Project Costs <br />Construction <br />Pedestrian Ramps <br />Overhead <br />Contingency <br />Lowell to Orono <br />$533,000 <br />$40,000 <br />$75,000 <br />$26,000 <br />Lowell to Bridge <br />$400,000 <br />$38,000 <br />$56,000 <br />$20,000 <br />Total $674,000 $514,000 <br />