My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. SR 07-23-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
07/23/2001
>
4.2. SR 07-23-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:36 AM
Creation date
5/14/2003 2:26:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/23/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER ARENA <br />1000 SCHOOL STREET N.W. <br />ELK RIVER, MN 55330 <br />(763) 441 - 2956 <br /> Fax (763) 241 - 9432 <br /> <br />To: Elk River City Council, Mayor <br /> <br />From: Rich Czech, Arena Manager <br /> <br />Date: July 23, 2001 <br /> <br />Subject: Arena Bleachers Bids <br /> <br />This morning I received one bid for the Arena Bleachers from E.F. Anderson. <br />The bid was $58,716.00. Attached for your review is the bid information as <br />well as the proposals for the heating system and the P.A. system. I included <br />an alternate bid for stairs that would lead from the top of the bleachers to the <br />rink floor, unfortunate there was no bid for this item. The stairs would <br />provide another set of stairs for getting spectators to and fi-om the main level. <br />There is one set of stairs existing now, during High School games they tend to <br />get crowed. I am still optimistic that stairs could be added to the project now <br />or at a later date if the council would like to proceed with them. <br /> <br />The original proposal from B and D Plumbing did not take in account the <br />electric wiring needed to operate the heating system. The electric wiring will <br />add another $2,500.00 to the system, bringing the total for the heating system <br />to $18,700.00. <br /> <br />The proposal for the P.A. system is $5,841.80 and would provide sound to <br />the new bleachers area as well as to the south end where people stand. The <br />total package to add bleachers to the East Side of the Olympic rink is <br />$82,717.80 plus tax. The estimate originally had the total cost of the project <br />to be $83,700.00 <br /> <br />With Elk River Youth Hockey and the School District contributing to the <br />project, I recommend that the Council approves' the Bleacher Project for the <br />Olympic rink. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.