My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.7. SR 07-16-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
07/16/2001
>
6.7. SR 07-16-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:35 AM
Creation date
5/14/2003 2:14:57 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/16/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R, Green Qompany <br /> <br />May 16, 2001 <br />File: 811180J-0240 <br /> <br />Ms. Michele McPherson <br />Director of Planning <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330-0490 <br /> <br />RE: KLIEVER LAKE FIELDS ADDITION <br /> <br />Dear Ms. McPherson: <br /> <br />As requested, we have reviewed the submittal for the Kliever Lake Fields Subdivision. This is <br />the development of the Holzum 80-acre farm property at the southwest corner of CSAH 12 and <br />Fillmore Street. The submittal package was prepared by Pioneer Engineering and consisted of <br />a preliminary plat, preliminary grading plan, preliminary site and utility plan, and preliminary <br />landscape plan. Also drainage calculations were submitted. Based on our review and <br />comments received at the staff review meeting, we would offer the following comments: <br /> <br />A. Preliminary Plat <br /> <br />· There is no drainage and utility easement on Outlot C for the proposed ponds shown <br /> on the grading plan. The same thing is true about the proposed pond expansion in <br /> Lots 9, 10, and 11 of Block 4. <br />· Drainage and utility easements need to be provided around the perimeter of Outlot C <br /> where it fronts on CSAH 12, Fillmore, and Street E. <br />· A separate landscape easement will likely be necessary for the landscaping shown <br /> along CSAH 12 and Fillmore Street. <br />· Easement will be necessary for a temporary cul-de-sac at the end of Streets A, B, <br /> and G. <br />· The City is currently in conversation with Sherburne County and the landowners <br /> north of CSAH 12 about potentially rerouting County Road 40 in the future. If this <br /> rerouting comes to pass, it will likely require the relocation of Fillmore slightly to the <br /> west as it meets CSAH 12. If this happens, it will be necessary for the City to <br /> acquire a portion of Outlot C for this realignment of Fillmore Street in the future. <br /> <br />B. Grading Plan <br /> <br />At the staff review meeting, Sherburne County indicated that they will not allow the <br />expansion of their pond located in Block 4. Drainage from this development will <br />need a pond that is totally separate from the County pond. <br /> <br />O:\PROJ\811180J\Ltr 05-16-01 McPherson.rev. doc <br /> 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.