My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6. SR 03-15-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
03-15-2010
>
6.6. SR 03-15-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2010 4:00:48 PM
Creation date
3/12/2010 4:03:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t~ctober 7, 2005 <br />Project 00790~.O~O,o <br />Il~r. John Elks <br />Minnesota Pollution Control Agency <br />520 Lafayette Raad North <br />St. Paul, MN 55155 <br />Mr, Matt Ledvina <br />Natural Resource group, lnc, <br />~Ot~~ South Sri' Street, Ste 1000 <br />Minneapolis, MN 55402 <br />Subject: Response to MPCA Cornta~ent Letter dated July 2C, 2005 and Comments ernailed <br />August 25, 2Q05 an behalf of the City of Elk River pertaining to the <br />Revised Hydrageol~ogic Evaluation Phase ~ and 11) Report, Water Monitoring <br />System Phase ~~~~ Report, and Phase r~ Water Quality Manitoring'~ork Plan, <br />South Development Area, SWr74 <br />Elk River Landfill, Elk River Minnesota <br />Dear Mr. Elks and~Mr, Ledvina; <br />Thank you far your reviews of the Revised Hydrogeolagic Evaluation Phase ~ a~~d ~Z~ Repo~~;, <br />Water Monitoring System Phase r~~~ Report, and Phasc 1~ Water Quality Monitoring Work <br />Plan, South Development Area prepared far the Elk River Landfill. Attached to this letter is an <br />A.ddendun~ to the Revised Report containing replacement test and figures per the issued <br />canunents, <br />Below are respa~ases to the eornnaents provided in the July 2G, 2005 MPCA comment letter and <br />the August 25 comments smelled on behalf of the City of Elk River, ~`or clarity, the original <br />consents are reproduced in italics and are followed by responses in standard fart, <br />PEA. ~oment~ dated Jul ~G X005 <br />1. Sectr'on ~. ~~ 5 ~efe~ences three water level monitoring events, only two events were <br />submitted in Ta~1e 3. The narrative wild be corrected to reflect data ~efe~enced in 7'a~le 3. <br />The narrative has been changed as described and replacement test for Section 4,2.5 is <br />included in the attached Addendum. <br />,~, deference to .~.PC.~ coretents dated ~a~gust 6, ~~D4, will ~e included in Section 8, D, <br />,References <br />The following correspondence has been added to Section 8,01References section in the <br />attached ,A.ddenduna: <br />MPCA camn~ent letter to WM~ dated August ~, 2004 <br />a MPCA comment letter to WM~ dated July ~~, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.