My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2. SPSR 03-02-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Site Plan Review
>
2010
>
03-02-2010
>
2. SPSR 03-02-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2010 3:15:10 PM
Creation date
2/26/2010 2:57:45 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~'m%~ . . <br />ner, ~ <br />From: Barnhart, Jeremy <br />S~n~: Monday, February 22, 2D1 D 11:D3 AM <br />Y®: Huebner, Debbie <br />Subject: FW; SiTE PLAN <br />At~achmen~s; 2~19~10 Eik River Al-1.pd~ <br />,.,, <br />;,,. <br />M~ <br />2-19-~0 Elk diver <br />Al-~.pdf X13,,, <br />For site plan. <br />Jeremy Barnhart ~ City of Elk River ~ 13D65 mono Parkway ~ Elk River, MN 55330 J <br />763.635.103 Office ~ 763.635.1090 Fax ~ www.ci.el k-river.mn.us <br />--~-----Original Message----- <br />From: Don Baker [mailto:dbaker@dbaarchitects.com] <br />Sent: Friday, February 19, 2010 5:16 PM <br />To: Barnhart, Jeremy <br />Cc: John Duffy; Jeff VonFeldt; awager@dbaarchitects.com <br />Subject: FW: SATE PLAN <br />Jeremy, <br />Attached is a revised site plan that incorporates the changes we discussed during our <br />meeting Tuesday as well as other improvement which seem to be desirable. Please pass a <br />copy on to the fire marshal, and city engineer and building official for their comments. <br />:: <br />The big difference between this site plan and the one we looked at Tuesday is the location 'r <br />of the entrance into the garage. This scheme provides an additional 5' between the fire <br />r <br />lane/driveway into the garage and the east property line know lOT}, and keeps the fire <br />lane/driveway about 10' east of the building. Tt will eliminate cross slope on the fire <br />lane/driveway, and it looks like we may be able to drain the fire lane/driveway runoff <br />water overland off of the end of the fire lane and eliminate the pipe and catch basin in <br />front of the overhead door. ~ also think it will enhance the front elevation of the <br />building by moving the overhead door onto the end of the building. <br />Please feel free to call with questions and/or comments. <br />Don Baker <br />DBA Architects <br />7300 Hudson Blvd No, Suite 230 <br />oa kdale, MN 55128 <br />651-~71~-8.15 Office <br />612-991-064 Cell <br />651--755--~.~28 Fax <br />dbaker@dbaarchitects.com <br />www.dbaarchitects.com <br />The information contained in this electronic transmission may be privileged and <br />confidential, It is intended only for the use of the individual or entity named above. Tf <br />the recipient of this transmission is not the intended recipient, or an employee or agent <br />responsible to deliver it to the intended recipient, any dissemination, distribution or <br />reproduction of the transmission is strictly prohibited. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.