My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.4. SR 07-09-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
07/09/2001
>
3.4. SR 07-09-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:34 AM
Creation date
5/8/2003 2:10:35 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/9/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Mayor and Council <br /> <br />Pat Klaers, City Ad~n~istr~tor <br /> <br />July 9, 2001 <br /> <br />Westwood Sewer Line Repair <br /> <br />Item 3.4. <br /> <br />Attached for your information is a letter from the city engineer regarding the repair of the <br />McGarthwaite sewer service line. We are not sure who is responsible for the sewer line <br />problem but it is clear that this unique problem was a result of thc original hookup to the <br />house (The contractor may have been at fault or we might have made an error in our <br />inspection). I believe the city and not the homeowner should be responsible for the cost of <br />correcting this mistake. The WWTP reserve fund can absorb this expense. This is the first <br />situation of this type that we have experienced in over 15 years. <br /> <br />RECOMMENDATION <br />It is recommended that the city pay for the Westwood sewer line repair. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.