My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 02-16-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
02-16-2010
>
6.3. SR 02-16-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2010 11:10:09 AM
Creation date
2/12/2010 3:15:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />gage Z of 3 <br />NSarch 1 S, 2005 <br />The modecations included as part of the .~fSE Cerr ~ 7 Construction .Pans and S eci cations are <br />.~ ~ <br />as follows; <br />~., Cep 7 ~asegrades:.A,s approved in a letter dated January l6, 2003, Cell ~ 7 will be <br />constructed at the same elevations as the base grades in Cell l ~, This volume addition was <br />included in the ~R.L's current pez~nit, S~wp74, dated October g, 2003. <br />2, Southern erns Canstr~ctiou: The southern berm of Cell 17 has been modified such that it <br />will now be constructed with an inbound slope ranging from 2:1 to 4.5:1 horizontal: <br />vertical}. The initial construction, as spawn on the plan sheets ~Sheet~ 3 and ~ would be for <br />a bean that is approximately 4.5 feet high. The initial berm. will be constructed very similar <br />to the phase separation berms typically placed between each cell. A.s the ~Iling of Cell ~ 7 <br />progresses, this berm wi11 be extended up in 7~5 foot vertical increments. The berm will <br />continue to be extended until the Southern nevelapment Area is permitted ar closure grades <br />are reached. The phased construction of this berm is detailed on the attached ~'Iguxe .. <br />3~ west erm~ Constructfan; The west berm is currently permitted with an outside slope to be <br />constz~ucted at approximately ~ .5.1 ~horizontai; vertical} in an effort to preserve trees located <br />in the setpback area, During a recent field survey it was noted that there were few trees <br />located in close proximity to the proposed outside tae of the slope, and none of the gees ~. <br />close proximity of the berm. were of significant size, Therefore, the ~~L ro ores to <br />pp <br />construct the outside slaps ofthe Cell l7 west berm at a 2;~1 slope, The 2:1 slope will be <br />easier to construct and easier to maintain than the currrently per~uitted x..5:1 slope, This <br />modified bens. is shown an Sheet 3 and associated details. <br />4. ternative Liner esign:.A,.s recently discussed an the phone, the ERL would also like the <br />aptiaxi to substitute a layer of Geosynthetic Clay Liner (GCL fvr the upper i2-inches of . <br />compacted clay. The technical specifications fox the GCL and installation of the GCL are <br />included iii tae enclosed CeZI .~ 7 ~'onst~uction Plans acid Specif~ica~ions. The ~RL is <br />requesting to keep the base of the clay linear at the carne elevation as wauld.be used ~. the <br />currently approved 2~foot clay layer design, and therefore an additional ~ Mfoot of air space <br />would be gained, see ~'zgure ~, C~p~~on A., Zf approval far the Option ~. base liner <br />~nodz~icatian is obtainable by the ~staxt of canst~ruuction, the reserve capacity already permitted <br />is sufficient to acconuuodate this m.adi~.catian. The Option A, modi~.cation will increase the <br />perrn~tted capacity by appraxiin.ately 6,700 cubic yards. however, as previously stated, the <br />~~L is anticipating the initiation. of Cell ~ 7 construction in .~pril and cannot postpone or <br />delay this construction timepfiarne, ,~.s a result, the ~~.I, has. also sub~.i.tted an additional <br />liner detail ~~igure ~, Option }that will maintain the currently perzni.tted base of waste <br />elevations, and therefore substituting GCL fox the l~faot of clay; will raise the base of the <br />clay liner by l foot, Ultimately, the decision as to whether or not GCL will be used~in place <br />of lfoot of clay will be dependent an the costs associated with clay layer placement and <br />GCL material and placement at the ~~L, <br />S~ Sand. rainage layer: Lastly, as a paint of clarif~catian, the ET~.-'s permit requires a l2~ <br />inch sand drainage layer meeting the necessary penueability requi:re:~.ents. The enclosed <br />
The URL can be used to link to this page
Your browser does not support the video tag.