My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 02-16-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
02-16-2010
>
6.3. SR 02-16-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2010 11:10:09 AM
Creation date
2/12/2010 3:15:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landfill areas which receive final cover, A CAA report sha11 also be submitted for <br />installation of leachate recirculation drainfield areas to document position within <br />the cell, suitable base contours and piping elevations. The report sha11 <br />demonstrate that the work was completed to the plan specifications, The Report <br />sha11 be certified by an engineer registered in the State of Mirnlesota and shall <br />include but not be limited to. <br />~a} A11 relevant construction specifications; <br />fib} All sloop drawings for prefabricated components; <br />(c} Photo documentation of all critical aspects of construction; <br />~d} Deflection testing results for leachate collection and transmission <br />p~Pes~ <br />fie} Narrative description of all as-built variances from the plans andlor <br />specifications; <br />~f} As-built cross~sections of the liner subgrade; <br />fig} As~built elevations far all pipe inlets and outlets and pump <br />onlpump-off controls; <br />~h} Completed manufacturer warranties; <br />~i} A11 physical testing results for soils and other materials use in the <br />constz~uctian <br />X09} Licensee shall notify the City at least two ~2} days in advance of liner <br />barrier layer installation or final cover barrier layer installation. Licensee shall <br />assist tl~e City in arranging inspection of the site at any reasonable time the City <br />requests, The Licensee sha11 keep the City informed of ongoing construction <br />progress and shall specifically notify the City of significant changes encountered <br />in the geological, hydrological, or construction conditions. The City may <br />reasonably require work, which is covered or otherwise obscured prior to City <br />inspection, to be re~excavated for City inspection, <br />X10} Temporary Fencing-0n Site Litter Control. Litter control fences sha11 be <br />maintained around the working areas} of the landfill to prevent the blowing of <br />paper or other litter an or off site, The Licensee shall assign employees to engage <br />in a regular and routine pragra~n to inspect the Landfill Site and clean up areas <br />where litter accumulates on the Landfill Site. <br />X11} Permanent Fencing. The Licensee shall maintain a minimum six~foot high <br />fence around the perimeter of the site if and when necessary based upon <br />
The URL can be used to link to this page
Your browser does not support the video tag.