Laserfiche WebLink
Memorandum <br />Date: I1261I0 <br />To; Jeremy Barnhart, Planning Manager <br />Cc: <br />From: John Anderson <br />RE. Elk River Boat Storage <br />we have reviewed the plans provided including the following. <br />~ Site plan prepared by Lampert Architects dated l , 15. I D <br />~ Civil plans prepared by diver Surveying & Engineering dated 1112110 <br />The following are comments provided to the developer in the previous review and comments <br />on any changes that have been made ~. the current submittal. <br />~} ~ ~~ ~ ac~cm_n__nlr_n_tn r~v~nTra 14- ~n Inrrra nn~ni~n ~~_hnnrrcnl~ ~t hn nti-nf~©n*o~ rr~t-~ n <br />lg-~~ Addressed in revisions <br />. 1.. <br />b ~~~~.na n~rnnnt ntrnvr~~~nr~r en r~nsrnr! ~s+ h, z, I~,+~~~ <br />Addressed in revisions . <br />c} the existing easements that need to be extingl~i.shed. No documentation noted in revisions <br />d} the NPDES SwPPP is ok but needs the contractor signature bef ore starting work when he is selected No <br />Change <br />e} ~~~ ~~;~~~~ nn~nn nre~ n~rNa Change <br />I} there is a small drainage swale on the south side of the building that slightlycrosses the lot line. The drainage <br />calcs show this area tabs a small amount o~ drainage from each lot. 'This area needs to covered by an <br />additional D/U easement because the ~0 f oot one on the plat is probablytoo small. Also we should get <br />prao~ in our f ilex even though Sharp nay still own both lots that he has the right to grade on the adjacent lot. <br />The drainage easement needs to be expanded on Lot 6 Block 1 ~. this area to cover the <br />infiltration area, Provide proof of ownership on lot to the east, Also it appears the <br />landscape plan proposes to plant trees within. the drainage and utility easement which <br />may make it difficult to maintain the in~.ltration basin in the future for the owner. <br />~ 1 1 1 1 1' <br />' []4"d 1n n nn1~ om hnr~lmn^ni-. n~L1Tim~lr_f_tNO.~YWtN~i1 rY~ Y11nn 1'hnM <br />SS ~ry 1 f 1 i 1 ~1 <br />rif f~ Han1-nvr4l-rnr~ n~nn` i No an n!-r~w~r~rlr~ r.lnv~ rl~ant-i~f- c+hnrrr noo~inrr M~n orwhnn lrr~pNM~nran <br />Addressed in revisions <br />In addition to these comments we would also like to see another issue addressed in the plans. <br />During the construction of the public roadway the developer requested curb opening be <br />constructed in anticipation of lot development, The plans need to indicate if any curb <br />openings are inplace for this lot, If there are curb opening for the lot that will not be used the <br />opening should be eliminated with the development of the lot, <br />BDM P~~oject #22G000 <br />