My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 06-18-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
06/18/2001
>
6.4. SR 06-18-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:34 AM
Creation date
5/7/2003 8:51:35 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/18/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br /> <br />(10) <br /> <br />(11) <br /> <br />(12) <br /> <br />Traffic <br /> <br />ao <br /> <br />bo <br /> <br />Except for localized jobs, traffic through Elk River <br />associated with this Operation shall be limited to 221st <br />Avenue to U.S. Highway 10 and 169. <br /> <br />Minimum four feet high berms shall be maintained <br />adjacent'to US Trunk Highway 169 and 221st Avenue <br />until time of final reclamation. <br /> <br />Dust Control <br /> <br />ao <br /> <br />bo <br /> <br />A permit from MPCA regarding air emissions shall be <br />obtained when required and particulate emission <br />standards shall be met by the Operation. <br /> <br />Co <br /> <br />All equipment shall be located as to reduce dust to <br />adjacent properties. <br /> <br />do <br /> <br />Water, but no chemical agents, shall be used to <br />control dust when necessary. <br /> <br />The City reserves the right to require additional <br />measures to be taken, if warranted by dust problems, <br />including but not limited to reducing stock pile <br />heights." <br /> <br />Hours of Operation <br /> <br />All mineral excavation, processing, and sales activities shall <br />be conducted between the normal hours of 7:00 a.m. and <br />7:00 p.m., Monday through Saturday, except the hours for <br />the hot-mix asphalt plant may be extended by the Building <br />and Zoning Administrator for special cases. <br /> <br />(13) Noise <br /> <br />As deemed necessary by city staff, noise from <br />screening and crushing associated with this Operation <br />shall be controlled by equipment location on site, the <br />erection of sound barriers, the placement of stockpiles, <br />and the type of equipment used. <br /> <br />s: \b&z\ stever \gravcup.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.