My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 06-18-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
06/18/2001
>
6.4. SR 06-18-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:34 AM
Creation date
5/7/2003 8:51:35 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/18/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
And <br /> <br />And <br /> <br />2.) <br /> <br />3.) <br /> <br />4.) <br /> <br />5.) <br /> <br />The East ~ of the Southwest ¼ of Section 3, Township 33, Range 26 <br />lying West of US 169, Except the northerly 525' <br /> <br />The W ~ of the SW ~ of Section 3, Township 33, Range 26, Except <br />the north 525 feet thereof <br /> <br />That part of the North 1121.92 feet of the Northwest Quarter of <br />Section 10, Township 33, Range 26, Sherburne County, Minnesota <br />lying east of a line which begins at a point on the north line of said <br />Northwest quarter distant 965.801 feet east, as measured along the <br />north line from the northwest corner thereof; thence south at a right <br />angle 1121.92 feet; and lying west of the westerly right-of-way line of <br />U.S. Highway No. 169 as laid out and traveled in 1963. <br /> <br />Name and Address of Operator and Land Owner: <br /> <br />Tiller Corporation <br />7200 Hemlock Lane <br />Suite 200 <br />P.O. Box 1480 <br />Maple Grove, MN 55311-6480 <br /> <br />(763) 425-4191 <br /> <br />Names and addresses of all adjacent land owners within 350 feet of site <br /> <br />See attached Exhibit 1. <br /> <br />Purpose of Extraction: <br /> <br />The purpose of the extraction is to remove an existing deposit of sand <br />and gravel and process it into construction aggregate, processing of <br />recyclable concrete and asphalt and hot mix asphalt production. The <br />site serves the growing needs of Elk River and the surrounding area. <br /> <br />Estimated Time Required to Complete the Proposed Extraction: <br /> <br />The site is operated in phases. It is estimated that the proposed <br />revisions to the mining limits will add an additional 2-3 years to the <br />over all mining operation. The original mining operation was estimated <br />to take 20-25 years to complete mining. The duration of mining <br />activities is approximate only and is dependent upon market demand. <br /> <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.