Laserfiche WebLink
TILLER CORPORATION <br /> APPLICATION FOR AN <br /> AMENDMENT TO <br /> CONDITIONAL USE PERMIT <br />FOR MINERAL EXCAVATION <br />AND HOT-MIX ASPHALT PLANT <br />CU 97-19 <br /> ELK RIVER, MINNESOTA <br /> <br />I. INTRODUCTION <br /> <br />Tiller Corporation is seeking an amendment to their existing Conditional Use <br />Permit for Mineral Extraction on a parcel of land located in the northern <br />portion of Elk River. The original CUP was issued in 1997 and includes a <br />parcel of property that encompasses approximately 133 acres. The proposed <br />amendment involves the revision of mining limits at two areas of the site. <br /> <br />One of the mining limit revisions includes the addition of an18.55 acre parcel <br />of property north of 221st Avenue. This additional parcel of property fills in <br />the southwest corner of the site north of 22 lS' Avenue. The western portion <br />of this site is adjacent to the City's trail system. A 200-foot setback will be <br />maintained along the western edge of the parcel resulting in an additional <br />10.71 acres of mining area. The 200-foot setback will remain vegetated and <br />undisturbed providing a buffer for the trail. <br /> <br />The second area of mining revisions is south of 221st Avenue. A property <br />transfer of two 5.31 acre parcels between Tiller Corporation (Tiller) and C.S. <br />McCrossan, Inc. will result in the extension of the Tiller site south of 221st <br />Avenue to the west approximately 200 feet and the removal from the Tiller <br />site a piece of property lying immediately south of 221st Avenue. Proposed <br />mining limits extend beyond Tiller's new property boundary to the West to <br />allow better conformance to existing topography. <br /> <br />Figure 1 is a general location map of the site and Figure 2 illustrates the <br />proposed revisions to the mining operation. <br /> <br />All other site operations are proposed to remain the same and include mining, <br />processing and stockpiling of aggregate, stockpiling and processing of <br />recyclable concrete and asphalt and the operation of a hot-mix asphalt plant. <br /> <br /> <br />