My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 06-18-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
06/18/2001
>
6.3. SR 06-18-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:34 AM
Creation date
5/7/2003 8:48:07 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/18/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R, Green Company <br /> June 11, 2001 <br /> File: 809790J-0240 <br /> <br />Ms. Michele McPherson <br />Director of Planning <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330-0490 <br /> <br />RE: <br /> <br />TVVlN LAKES TOWNHOMES 3RD ADDITION <br />FINAL PLAT <br /> <br />Dear Ms. McPherson: <br /> <br />As requested, we have reviewed the final plat of Twin Lakes Townhomes 3rd Addition. Based <br />on our review, we would offer the following comments: <br /> <br />The proposed final plat contains 14 townhouse units (7 buildings). The 15th lot, which is <br />the common area, is contained entirely within a drainage and utility easement. No <br />grading plan was provided, so it is difficult to determine whether any drainage and utility <br />easements need to be provided on the 14 building lots. If you recall, in the second <br />addition, additional drainage and utility easements needed to be provided for drainage <br />flowing from the rear yards to the front yards of some of the units. The need for <br />additional easements needs to be determined prior to filing the final plat. <br /> <br />Before any construction can take place, an access permit will be needed from Sherbume <br />County for the road access onto CSAH 13. We believe that Sherbume County is going <br />to request the typical turn lanes and roadway widening at the access point be <br />constructed with the Tyler Street project. As you are aware, the north end of the Tyler <br />Street work merges with CSAH 13 in this area and includes an overlay of CSAH 13 up to <br />the existing Tyler Street. We are in conversation with Sherburne County at this time <br />regarding the necessary improvements at the access point to Twin Lakes Townhomes <br />3rd Addition and the future access point to Trott Brook Farms Addition immediately <br />across CSAH 13. <br /> <br />If you have any questions regarding these comments, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />TJM:tw <br /> <br />Ltr 06-11-01 McPherson <br /> 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.