My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. ERMUSR 01-12-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2010
>
01-12-2010
>
5.2. ERMUSR 01-12-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2010 3:13:17 PM
Creation date
1/12/2010 3:13:17 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER MUNICIPAL UTILITIES <br />Demand Electric Service <br />Determination of Billing Demand: The billing demand shall be the highest measured <br />demand (corrected for power factor if required) during any fifteen (15) minute period <br />occurring in the current billing period. But in no month shall the billing demand be <br />greater than the valve in kW determined by dividing the kWh sales for the billing month <br />by 75 hours per month. This billing adjustment applies only if the customer's peak <br />demand DOES NOT occur between the hours of 2:00 p.m. and 10:00 p.m. <br />Fluctuating Loads: Customers operating equipment having a highly fluctuating or large <br />instantaneous demand, such as welders and X-ray machines, shall be required to pay all <br />non-betterment costs of isolating the load from the balance of Elk River Municipal <br />Utilities' system so that the load will not unduly interfere with service on Elk River <br />Municipal Utilities' lines. In addition, Customers who fail to provide adequate corrective <br />equipment shall be required to own and maintain their own transformers. No motor <br />larger than ten (10) HP will be allowed to be across-the-line started without notification <br />and written authorization from Elk River Municipal Utilities. <br />Power Factor Adjustment: For loads of 50 kW or more, or at the option of Elk River <br />Municipal Utilities for loads of less than 50 kW, power factor adjustments will be made in <br />the billing demand, when the power factor, as determined by test, at the time of the <br />Customer's maximum use is less than 95%. If the power factor, as measured by Elk <br />River Municipal Utilities' electric department, is lower than 95%, the monthly demand <br />charge may be multiplied by the ratio 95% to the measured power factor, or at Elk River <br />Municipal Utilities option, the power factor may be corrected at the Customer's expense. <br />Terms of Payment: Bills are due and payable upon receipt and delinquent if not paid by <br />the due date noted the bill. There will beaten (10) percent late payment charge added <br />to all accounts that are not paid by the due date. <br />Terms and Conditions: <br />1. Usage may be fractionalized on the actual days of service for application of a <br />change in rate. <br />2. Service will be furnished under Elk River Municipal Utilities rules. <br />3. Extensions made for service under this schedule are subject to the provisions of Elk <br />River Municipal Utilities' rules governing Extension of Service and Facilities. <br />4. The rates set forth herein may be modified by the amount of any governmental <br />changes imposed and levied on transmission, distribution, production, or the sale of <br />electrical power. <br />A roved { ~ ~ ~ Adopted December 15,2009 <br />pp --~^~ Effective January 1, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.