My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 06-18-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
06/18/2001
>
4.3. SR 06-18-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:33 AM
Creation date
5/7/2003 8:38:29 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/18/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ft Status Report on the Northstar Commuter Rail Project. June 7, 2001 <br /> <br />G. Results Locally Preferred Transportation Investment <br /> Strategy (LPTIS) <br />Considering the results of the evaluation of the alternatives, the <br />NCDA concluded that a comprehensive, multi-modal transportation <br />investment strategy best meets the goals and objectives of the <br />Northstar Corridor. The recommended elements of the LPTIS are <br />as follows: <br /> <br />· Commuter Rail between Downtown Minneapolis and St. <br /> Cloud/Rice <br />· Expanded Feeder Bus Service <br />· Roadway Improvements in the TH 10 Corridor <br />· Two New River Crossings <br />· Intelligent Transportation System (ITS) Initiatives <br />· Bicycle/Pedestrian Improvements <br /> <br />In addition to these specific elements, the NCDA recommended <br />that the appropriate governmental entities work to implement <br />additional transportation connections at both ends of the Northstar <br />Corridor to ensure safe and efficient travel throughout the Twin <br />Cities and St. Cloud metropolitan areas. (See Resolution 1999-06 <br />in Appendix B) <br /> <br />Northstar Corridor Development Authority 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.