Laserfiche WebLink
Capital Improvement Plan <br />City of Elk River, Minnesota <br />2010 thru 2014 <br />Project # WW_23 <br />Project Name Bio solids disposal study <br />Type Study Department Sewer Department <br />Useful Life Unassigned Contact Engineer <br />Category Unassigned Priority n/a <br />Description <br />Study to analyze sludge (Bio Solids) handling at the WWTP as the sewage flow grows and the quantity of sludge <br />Justification <br />Che City WWTP currently spreads sewage sludge annually on approximately 150 acres of City owned property. As <br />sewage flow grows more storage will be needed at the WWTP to store sludge between spreadings. This study will <br />ook at other alternative methods to handle sludge in the future freeing up the 150 acres for other uses. <br />Expenditures 2010 2011 2012 2013 2014 Total <br />Engineering 25,000 25,000 <br /> <br />Funding Sources Total 25,000 <br />2010 2011 25,000 <br />2012 2013 2014 Total <br />Sewer Fund 25,000 25,000 <br /> Total 25,000 25,000 <br />Page 50 <br />