Laserfiche WebLink
Capital Improvement Plan <br />City of Elk River, Minnesota <br />2010 thrtr 2014 <br />Project # ST-12 <br />Project Name Signalization of 193rd Avenue & Evans Street <br />Type Infrastructure Department Infrastructure Improvements <br />Useful Life 20 years Contact Engineer <br />Category Street Construction Priority n/a <br />{t~~ <br />ascription <br />>tall a signal system including EVP at the intersection of 193rd Avenue and Evans Street. Because of the proximity <br />TH169, the signal system must be interconnected with the existing highway signal system. <br />Justification <br />The construction of 193rd Avenue (2009) street improvement opens 193rd to CSAH 13 allowing another route to and <br />from TH169. In anticipation of the increased traffic flow the intersection of 193rd Avenue and Evans Street was <br />constructed to accept a signal system. <br />Expenditures 2010 2011 2012 2013 2014 Total <br />Planning/Design 250,000 250,000 <br />Total 250,000 250,000 <br />Funding Sources 2010 2011 2012 2013 2014 Total <br />Municipal State Aid 250,000 250,000 <br />Total 250,000 250,000 <br />Page 26 <br />