My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 12-15-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
12-15-2009
>
6.1. ERMUSR 12-15-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2009 9:57:30 AM
Creation date
12/17/2009 9:57:29 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal Utilities <br />13069 Orono Pazkway . P.O. Box 430 <br />Elk River, MN 55330-0430 <br />TO: Elk River Utilities Commission <br />John Dietz <br />Jerry Gumphrey <br />Daryl Thompson <br />FROM: Wade Lovelette <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />SUBJ: Staff Update -Technical Services Department <br />The following is a summary of projects and/or updates over the past several weeks: <br />1. The Locating Department had a total of 1621ocate tickets for November. <br />Some of them are meets which require several trips back to the same area <br />as needed to mark utilities. Three of the tickets were emergency locates. <br />2. The Metering Department continues with weekly and monthly substation <br />checks, changing out meters to the radio read meters, and doing the <br />monthly power bill. <br />3. The Security Systems Department had a total of 69 phone contacts, 14 <br />personal visits, 14 systems quoted, 9 sales made, 13 installs completed, <br />and 17 service calls for the month of November. <br />4. Map books continue to be updated daily as crews add or change items in <br />them. We are getting ready for printing a new edition. <br />Power Plant staff has performed the monthly run of the generators and <br />everything looked good. Staff is also working on the spill containment <br />project and on the written lock-out tag-out procedures for each piece of <br />equipment in the power plant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.