My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 12-14-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
12-14-2009
>
5.1. SR 12-14-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2009 10:05:30 AM
Creation date
12/16/2009 10:03:51 AM
Metadata
Fields
Template:
City Government
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Curly Leaf Pondweed Control Plan <br />The Lake Drawdown Process: <br />•75% of Lake Property Owners need to sign a Petition asking the City of Elk River to apply for a <br />Lake Drawdown permit from the MN DNR. (by law, the City must apply for the permit) <br />–Petition signing is in process, estimate completion by the end of 2009 <br />•The City of Elk River is required to hold a Public Hearing on the Issue <br />•The City Council needs to approve the Permit Application before it can be submitted to the MN <br />DNR <br />•The MN DNR will require at least 40 -45 days for processing of the application. Preliminary <br />discussions them indicate that they will likely approve the permit as long as proper provisions are <br />made for wildlife survival, most notably, the Blanding Turtles <br />•The Elk River Municipal Utilities can then start the gradual drawdown process –assuming the <br />weather conditions are adequate <br />•Given the timelines for this process, the draw down would likelyoccur in the fall of 2010 <br />The draw down will occur in the fall of 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.