Laserfiche WebLink
Mr. Scott Harlicker <br />May 16, 2001 <br />Page Two <br /> <br />At this point in time, we would suggest that the preliminary plat can be approved based on the <br />storm drainage calculations, understanding that minor modifications to the design and grading <br />plan will be necessary before final approval of the drainage calculations is received. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />Terry J. Maurer, P.E. <br />TJM:tw <br /> <br />C:\windows\TEMP\Ltr 05-16-01 Harlicker.doc <br /> <br /> <br />