My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 05-21-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
05/21/2001
>
6.3. SR 05-21-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:33 AM
Creation date
5/7/2003 2:21:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/21/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KKE <br /> <br />Korsunsky Krank Erickson <br />Architects, Inc. <br /> <br />300 First Avtenue North <br />Minneapolis, MN 55401-1681 <br />612/339-4200 <br />612/342-9267 FAX <br /> <br />Memorandum <br /> <br />Project: <br /> <br />To: <br /> <br />From: <br /> <br />Date: <br /> <br />Subject: <br /> <br />Elk River Schools <br />KKE No. 01-06-1094-01 <br /> <br />Elk River Planning Commission and Planning Staff <br /> <br />KKE Architects - representing Independent School District No. 728 <br />March 20, 2001 <br /> <br />Conditional Use Permit for Additions to Elk River High School <br /> <br />Please accept this narrative as application for a Conditional Use Permit (CUP) for additions to <br />the Elk River Senior High School, located at 900 School Street. According to the City of Elk <br />River Zoning Ordinance Section 900.10, institutional uses within an area zoned as R-lC (Single <br />Family Residential - Sewered) require a CUP. The proposed additions are approximately 53,500 <br />square feet and will be located at the southwest and northwest corners of the existing high <br />school. <br /> <br />Most notably, the additions will include an 800-seat auditorium, which includes a stage, fly-loft, <br />and support space. Adjacent to the auditorium are choral new music and bandrooms. A 3,500 <br />square foot multi-purpose gym expansion, will also be constructed on the northwest side of the <br />building. Finally, a commons area will be located between the existing gym and new auditorium. <br /> <br />The addition will include a new front entrance into the school, which will also be more inviting <br />to the community at large. The entrance will include a lobby, or gathering area. Building <br />materials for the addition will include brick masonry, glass, and colored textured pre-cast <br />concrete wall-panels. The following is a summary for the planned improvements to Elk River <br />Senior High School: <br /> <br />Site Plan <br /> <br />Setbacks <br />The addition meets the required setbacks of 30 feet - front, 20 feet - rear, and 10- feet for side <br />lots. <br /> <br />Architecture <br />Planning <br />Interior Design <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.