My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4. SR 08-28-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
08-28-1995
>
7.4. SR 08-28-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2009 12:22:03 PM
Creation date
12/3/2009 12:22:03 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />4 <br />;,_ <br />;. :, <br />1.15! I~T-!1~ I1I~IS~f ftS <br />ITEM 7.4. <br />August 24, 1995 <br />File: 230-24b-30 <br />' 12fi Energy Pork Qr~~e Honorable Mayor and City Council <br />sr. Paul, nuv ssi~s City of Elk River <br />e!2•b~n~n3e4 13065 Orono Parkway <br />a ~80G~868.2929 P.O, Box 490 <br />Faz: b17.6~9.9dA6 Elk River, MN 55330 <br />RE: DODGE AND ELK HILLS DRIVE CONSTRUCTION BIDS <br />Dear Council Members: <br />We have tabulated the bids opened on Thursday, August 17, 1995, for the Dodge!Elk Hills <br />Drive Intersection Improvements. There were a total of five bids. The following is a list <br />of the five bidders and their total bids: <br /> Forest Lake Contracting $38b <br />b2p,30 <br />pull E1vGtNEERiNC- <br />Hardrives, Inc. , <br />387 <br />912.b8 <br />ErrilRCkrner~~At H&M Asphalt Company , <br />394 4 <br />03 <br />25 <br />P Bauerly Brothers . <br />416 <br />b8S <br />47 <br />IANyiNG <br />~~1~ wasre Northdale Construction , <br />. <br />421,306.3b <br />$FfUCiURAt <br />VEr; <br />l <br />A further analysis of the low bid provides the following breakdown: <br />suR <br />~ <br />s, <br />rRAfFMC <br />iRANS+'C)R?Af?Cx~ Elk Hills Drive Street and Storm Drainage $ 84,b29.35 <br /> Dodge Street and Storm Drainage I04,209.SS <br />E.EaRICAU~EChAr~~cA~ Dodge Avenue Street and Storm Drainage .85,400.40 <br />E"+iuvEERiNG. Signal Improvements 4g,p00,00 <br />"~Ac Traffic Control 25,000,0{} <br />~o+~4R ~ISTRlsunon+ Sanitary Sewer 17,518.75 <br />scKcA Watermain 20, 862.25 <br />SfSSEy1 CC~ty*RC)i5 <br />The overall cost of the improvement is slightly higher than anticipated. I believe this is <br />primarily due ro two factors. One is trying to maintain access to the businesses south. on <br />Dodge during the construction activities, and the second factor is a condensed construction <br />period late in the fall. <br />Forest Lake Contracting was the contractor who built School Street and Jackson Avenue. <br />They have successfully completed many projects in the past. We would therefore be <br />prepared to recommend award to them as the lowest responsible bidder. The award should <br />ofticES ~". be contingent on the Developer placing a surety acceptable to the City Attorney. <br />u,INNE.4P0US <br />~IOR LAKE <br />S1. PAUL <br />WASECA <br />90 d 1flL-J.d 1S tiSW T ~ 0 T flH1 S6-i~~-~flti <br />
The URL can be used to link to this page
Your browser does not support the video tag.