Laserfiche WebLink
<br /> <br />U <br />July 26, 1995 <br />y~4 L 1 <br />Sh.er~bur~ Coup ``~F,~, <br />.~-Ci hzva ~e art~~~ent 5~y~ <br />P.O. BOX 338 • ELK RIVER, MN 55330 PHONE (612)441-1722 FAX (612)441-2264 <br />Mr. Pat Klaers <br />City Administrator <br />Elk River City Hall <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />RE: CSAH 1 Improvements <br />Dear Pat: <br />As we recently discussed, the above referenced project has been changed slightly to reflect the <br />following: <br />- Phase 2, originally expected to be constructed between October, 1995 and November, 1995 <br />will remain on this schedule but is now referred to as Phase 1. <br />-The original Phase 1 was expected to be started in August, 1995, and completed before the <br />new school year will not be started until next year when the school year is complete. This <br />part of the project is now considered Phase 2. <br />Phase 1 of the project will now reflect a full four-lane wide section between CR 44 and CR <br />32. The roadway will be striped for a northbound right-turn-lane at the Country Club <br />entrance. Channelization to meet the existing roadway north of CR 32 will occur between <br />this entrance and CR 32. <br />Should you have any questions or require any additional information, please feel free to call. <br />Sincerely~.•~ <br />,-- <br />/G~~ <br />n M. Cote, P.E. <br />Assistant County Engineer <br />• <br />