My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.9. SR 08-21-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
08-21-1995
>
7.9. SR 08-21-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2009 9:25:18 AM
Creation date
12/3/2009 9:25:18 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/21/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTING ENGINEERS August 15, 1995 <br /> File: 236-002-20 <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br />612-644-4389 <br />1-800-888-2923 Mr. Bill Rubin <br />Fax: 612-644-9446 Economic Development Coordinator <br /> City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, MN 55330 <br />RE: QUOTE FOR DOWNTOWN PARKING LOT <br />Dear Mr. Rubin: <br /> As you requested, we have solicited a quote from Barbarossa & Sons for the work in the <br />avaENCwEERwG: downtown parking lot. The quote was prepared on a unit price basis. Following is a <br />ENVIRONMENTAL summary of their unit prices. <br />MUNICIPAL <br />~NNING <br /> <br />i <br />i <br />P <br />U <br /> <br />i <br />T <br />t <br />l P <br /> uanti r <br />ce <br />n <br />t r <br />ce <br />a <br />o <br />SOLID WASTE <br />STRUCTURAL 1. Mill surface 550 SF $ 5.25 $ 2,887.50 <br />SURVEYING 2 Bituminous removal 8,300 SF 0.65 5,395.00 <br />TRAFFIC <br />3. <br />Bituminous overlay <br />430 tons <br />29.00 <br />12,470.00 <br />TRANSPORTATION 4. Tack coat 200 gallons 1.10 220.00 <br /> S. 6~~ Concrete sidewalk 80 SF 3.25 260.00 <br />ELECTRICAL/MECHANICAL <br />ENGINEERING: 6. 4 ~~ Concrete sidewalk 250 SF 2.78 695.00 <br />Flvnc 7. B612 Concrete curb and gutter 1,575 LF 7.98 12,568.50 <br />POWER DISTRIBUTION 8. Pedestrian ramps 3 EA 106.00 318.00 <br />SCADA 9. Adjust castings 3 EA 160.00 480.00 <br />SYSTEM CONTROLS <br /> TOTAL $35,294.00 <br />This bid does not reflect the removal of the three concrete islands that Phil has requested <br />for ease of snow removal. This will reduce the units under concrete curb and gutter and <br />consequently reduce the total cost of the project. This quote is on a per unit price basis; <br />therefore, they are only paid for the units which are used. If you would like, we are <br />prepared to write a change order to the contract for the Western Area Phase II <br />improvements to have this work done by Barbarossa & Sons. <br />OFFICES IN: <br />MINNEAPOLIS <br />PRIOR LAKE <br />ST. PAUL <br />WASECA <br />
The URL can be used to link to this page
Your browser does not support the video tag.