My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.5. SR 07-31-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
07-31-1995 SP
>
8.5. SR 07-31-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2009 9:27:14 AM
Creation date
12/1/2009 9:27:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/31/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ \~ <br />~lk Ri <br />ITEM 8.5. <br />MEMORANDUM <br />V~~ TO: Mayor & City Council <br />FROM: Pat Klaers, City Ad rator <br />DATE: July 31, 1995 <br />SUBJECT: Ice Arena Update <br />Since the last presentation to the City Council on the ice arena project on <br />May 22, 1995, not much activity has taken place on this project. On 5/22 it <br />was finally concluded that the project that was desired was about $2.8 to $2.9 <br />million dollars and that only about $2.1 million was available. This $2.1 <br />million dollars that is available comes from a $100,000 contribution from <br />youth hockey and $2 million dollars being available over the life of the bonds <br />from the revenue generated off of two sheets of ice as compared to the <br />operating expenses. <br />Since 5/22, the Task Force has met with the architects as a temporary wrap <br />• up to the project and the Task Force has also met with the president of youth <br />hockey. Additionally, Task Force Chair Jeff Gongoll and I have been <br />following the Mighty Ducks legislation and the activities of the Minnesota <br />Sports Commission as this group is charged with the responsibility of <br />awarding grants from the Mighty Ducks money for ice arena projects. At this <br />point, it is anticipated that a city grant application will need to be submitted <br />in September and grants will be awarded later in the fall or in early winter. <br />Even if the city is fortunate enough to receive $250,000 in Mighty Ducks <br />money, the project is still short of funds. If we are fortunate enough to get <br />the Mighty Ducks monies then we either have to tell the architects to build <br />the best project they can with the money that is available or obtain <br />additional financial commitments from youth hockey or other agencies (i.e., <br />the school or the city). <br />Everyone in Elk River wants a second arena that they can be proud of and <br />does not want to construct another "tin" structure. Accordingly, if we have <br />$2.35 million available, the building will be a very bare minimum shell type <br />of structure. We do not want to end up compromising a design in 1996 which <br />we may regret in the year 2006, simply because we were $200,000 or so short <br />of funds. <br />• council:icearna <br />13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.