Laserfiche WebLink
• 7. THAT THE NATURAL VEGETATION BETWEEN THE ASPHALT PLANT AND <br />HIGHWAY 169 BE LEFT TO ACT'AS SCREENING. <br />8. THAT DURING DRY PERIODS THE SITE MUST BE WATERED TO AVOID DUST. <br />9. THAT COMMERCIAL ASPHALT CO. REIMBURSE THE CITY FOR THE COST OF <br />REVIEWING THEIR PROPOSAL. THAT THE CITY HAS THE RIGHT TO CLOSE THIS <br />OPERATION DOWN IF THERE IS IMMINENT DANGER AND THAT CITY STAFF <br />HAS THE RIGHT TO INSPECT THE PREMISES AT ANY REASONABLE HOUR <br />FOLLOWING NOTIFICATION. <br />10. THAT THE NORMAL HOURS OF OPERATION FOR THE PLANT ARE FROM 7:00 <br />AM TO 7:00 PM, SEVEN DAYS A WEEK. HOWEVER, HOURS CAN BE <br />EXTENDED FOR SPECIAL CASES BY THE BUILDING AND ZONING <br />ADMINISTRATOR AS LONG AS THE ADDITIONAL HOURS DO NOT CREATE A <br />NUISANCE FOR SURROUNDING RESIDENCES. FURTHER MPCA NOISE LEVELS <br />MUST BE ADHERED TO AT ALL TIMES DURING THE OPERATION OF THIS <br />PLANT. <br />11. THAT THE BAGHOUSE IS TESTED ONCE PER MONTH FOR LEAKS DURING THE <br />OPERATING SEASON AND THE RESULTS OF THOSE TESTS ARE COPIED TO THE <br />CITY. <br />12. THAT THIS CONDITIONAL USE PERMIT BE REVIEWED IN TWO YEARS AND A <br />• NEW PERMIT BE OBTAINED AT THAT TIME. <br />13. THAT STOCKPILES OF RECYCLABLE MATERIALS NOT BE PLACED IN SURFACE <br />WATER AND FURTHER THAT RUN-OFF FROM THESE STOCKPILES IS DIRECTED <br />AWAY FROM ANY SURFACE WATER. THAT THE SIZE OF THE STOCKPILES BE <br />LIMITED TO THE AMOUNT OF MATERIAL THAT COULD POSSIBLY BE USED IN <br />ONE YEAR, BUT NOT NECESSARILY TO WHAT WILL BE USED IN ANY ONE <br />GIVEN YEAR. FURTHER, THAT THE CITY UNDERSTANDS WITH THIS <br />STIPULATION THAT SOME RECYCLABLE MATERIALS WILL BE RETAINED OVER <br />THE WINTER SO THAT RECYCLING CAN START AT THE SAME TIME AS SPRING <br />START UP FOR THE ASPHALT PLANT. <br />14. THAT COMMERCIAL ASPHALT CO. CONTINUE TO WORK WITH CITY STAFF TO <br />RESOLVE PROBLEMS WITH NOISE IF THEY ARISE. <br />15. THAT COMMERCIAL ASPHALT CO. CONTINUE TO WORK WITH CITY STAFF TO <br />ELIMINATE SEDIMENT FROM BEING INTRODUCED TO THE POND ON THE <br />EAST SIDE OF HIGHWAY 169. <br />16. THAT COMMERCIAL ASPHALT CO. REDUCE ODOR FROM THEIR PLANT TO <br />ACCEPTABLE LEVELS. <br />DATED this day of , 1995. <br />• <br />cup-asph/bz/stever <br />